The feeder should be installed on a fixed basis in accordance with the specified installation method. The wheel should be wedged with a triangular wood or braked with a brake before the mobile feeder is officially operated. In order to avoid walking in the work, when there are multiple feeders working in parallel, there should be one meter between the machine and the machine.
Before using the feeder, check whether the running parts, the tape buckle and the carrying device are normal, and whether the protective equipment is complete. The tension of the tape must be adjusted to an appropriate level before starting.
The belt feeder should start at no load. After the operation is normal, the material can be fed. It is forbidden to drive after entering the material first.
When several feeders are operated in series, they should start from the discharge end and start in sequence. Only after all normal operation can the material be fed.
When the tape is deviated during operation, it should be stopped and adjusted, and should not be used barely to avoid wearing edges and increasing load.
The working environment and the temperature of the material to be delivered shall not be higher than 50 ° C and lower than -10 ° C. Do not transport materials with acid-base oils and organic solvents.
Pedestrians or passengers are prohibited on the conveyor belt.
Before stopping, you must stop the feeding, and then stop the storage on the belt before parking.
The feeder motor must be well insulated. Do not pull and drag the mobile feeder cable. The motor must be reliably grounded.
When the belt is slipping, it is strictly forbidden to pull the belt by hand to avoid accidents.